Thursday, June 18, 2009

Waterproofing With Hot Mop Tar

A waterproof barrier is required before pouring a new concrete deck. Without a waterproof membrane, water damage and dry rot will occur. Find a good hot mop contractor in you area.
When a concrete deck fails, it is because the waterproof barrier has failed to hold back the water. Do not cut corner on this phase of the project.

Friday, June 12, 2009

Hidden Damage Caused By Water in Concrete Decking


This is a photo of the same deck from an earlier posting, the underside has been removed to expose the extent of the damage to the sheathing, joists, and header boards. The concrete decking above only had minor cracking to the surface.
The water proof membrane under the concrete has failed to keep the water from seeping into the supporting lumber.

Monday, June 8, 2009

Concrete decking water damage.

light weight concrete

If the waterproofing under a concrete deck has failed (no longer water tight) the signs of leaking will appear below, long before the concrete gets loose above. Checking for leaks in the underside of a concrete balcony or patio should be watch and checked annually for signs of water damage.

Wednesday, June 3, 2009

Water Damage in Lincoln

I got a call from a property manager in Lincoln, Ca regarding some water damage. The water damage is extensive, removal will take a while to complete. Some areas will nbe treated as an emergency; rot and mold was found. Resident safety will be a priority.
Water had rotted the wood decking and framing. Dry rot needs to be eliminated and removed off site properly. Tromler Construction has a lot of experience in the removal of water, rot, and mold damages.
Here is an example of some of the damages.

Sunday, May 31, 2009

Lightweight concrete deck repair.

After putting the sheating and flashing, we were ready for the hot tar and paper membrane. The hot mop will prevent moisture from penetrating into the wood sheathing and framing.

Tromler Construction was on a tight schedule and did not get a chance to show final pictures of the concrete. We will by back to this unit for some touch-up painting, we should be able to get some final picture at that time.

Saturday, May 30, 2009

Rain Gutter Repair

Cameron Park Contractor

Rain gutter repairs? Not exactly the first thing on the minds of homeowner and property managers right now, but there are some good reasons to make these gutter repairs now.
3 Reasons for repairing gutters now:
1. Contractors are more available to bid and repair.
2. Safer work environment, better working conditions.
3. Save money. There are lot of contractors willing to work for less.
Good luck with all your projects.

Wednesday, May 27, 2009

Another Wood Fence Completed













Tromler Construction finished up another fence today, a dog eared redwood fence. The old fence was dangerous and an eye sore, so a clean fresh fence was installed. Installation of the fence was quick and trouble-free. Here are some pictures if you are interested in seeing our work.
 
Custom Search