Sunday, May 31, 2009

Lightweight concrete deck repair.

After putting the sheating and flashing, we were ready for the hot tar and paper membrane. The hot mop will prevent moisture from penetrating into the wood sheathing and framing.

Tromler Construction was on a tight schedule and did not get a chance to show final pictures of the concrete. We will by back to this unit for some touch-up painting, we should be able to get some final picture at that time.

No comments:

Post a Comment

 
Custom Search
AnooX banner here